Heat pump buying checklist

What to ask a contractor for before you sign, including the AHRI certificate, Manual J and S, line set plan, electrical scope, permits and warranty registration.

Editorial staffEdited by heatpumpwiki

History 1
Contents

Before you sign, get these items in writing. ENERGY STAR's advice is to "get written, itemized estimates" and "compare cost, energy efficiency and warranties."Source 2 ENERGY STAR's contractor guide also says the contractor should "provide documentation of installation procedures, including sizing calculations, AHRI certificate, and records of any measurements or testing."Source 1

1. The exact equipment

2. The AHRI certificate

Ask for the AHRI Certified Reference Number for the exact matched combination. AHRI's advice: "The easiest way to verify that the system is properly matched is to ask your installer for an AHRI Reference Number."Source 3 Look it up yourself and check that every model number matches the quote. ENERGY STAR's guide adds: "Install a properly matched indoor coil when replacing an outdoor unit."Source 1 See Heat pump ratings explained: SEER2, EER2, HSPF2 and AHRI certificates.

3. A load calculation and equipment selection

  • A Manual J load calculation for your house, with the design temperatures used. ACCA says Manual J is "required by national building codes and most state and local jurisdictions."Source 4
  • The Manual S selection: the chosen unit's capacity at your design temperatures, and how backup heat covers any gap.
  • ENERGY STAR: "A contractor should size the heating and cooling system based on the size of your house, level of insulation, and windows."Source 2

If the size came from square footage alone, ask for a calculation. See Manual J, Manual S and Manual D explained.

4. The line set plan

  • Whether the existing refrigerant lines will be reused or replaced, and why.
  • The line length and height difference, compared with the manufacturer's limits.
  • How the lines will be pressure tested and evacuated, and whether you will get the readings. See What a good heat pump installation looks like.

5. Electrical scope

  • The outdoor unit's MCA and MOCP, and the wire and breaker size for each circuit (MCA and MOCP).
  • Whether the panel has capacity, based on a load calculation, and who does the electrical work.
  • The disconnect location.
  • Whether any panel or service upgrade is included or excluded. See Heat pump electrical requirements.

6. Ducts and airflow (ducted systems)

  • Whether existing ducts will be tested for static pressure and leakage, and what changes are included.
  • The filter location and size.

7. Backup heat and controls

8. Outdoor unit placement

  • Location, pad or wall bracket, and stand height above expected snow.
  • Clearances from walls, windows and neighbors. See Heat pump noise.

9. Permits, licenses and certification

  • Who pulls the permit, and that it is included. See Permits and inspections for heat pumps.
  • The contractor's license and insurance.
  • Refrigerant work must be done by technicians certified under EPA Section 608; EPA requires that "technicians who maintain, service, repair, or dispose of equipment that could release refrigerants" be certified.Source 5

10. Warranty and registration

Manufacturer warranties often require online registration within a set window to get the longer term. The window and terms differ by brand and change over time. As published on manufacturer sites, accessed October 2026:

Brand Registration window Notes
Carrier 90 days Without registration, a standard 5-year parts warranty; with registration, longer coverage optionsSource 6
Trane 60 days Registration extends the base 5-year coverage; labor is not includedSource 7
Lennox 60 days (except California and Quebec) Registration extends parts and compressor coverage on select modelsSource 8
Daikin (DMVT/DMVE/DFVE) 60 days Up to 12 years on parts with registration; California, Florida and Quebec residents do not need to registerSource 9
Mitsubishi Electric 90 days 12-year parts and compressor coverage when installed by its qualifying contractor networks in a single-family homeSource 10

Ask:

  • Will the contractor register the equipment, and will you get the confirmation? ENERGY STAR's guide lists completing and submitting the warranty information "on your behalf" among a reputable contractor's tasks.Source 1
  • What labor warranty does the contractor give, and for how long? Manufacturer warranties often cover parts but not labor.Source 7

11. Incentives

12. Payment and schedule

ENERGY STAR lists warranties, payment schedule, start and completion dates, dispute resolution, insurance and licenses, and permits as items a written proposal should cover.Source 1

For how to compare two quotes line by line, see How to read a heat pump quote.

Sources

  1. 1.A Guide to Energy-Efficient Heating and Cooling. ENERGY STAR (U.S. EPA). Accessed Oct 25, 2026
  2. 2.10 Tips for Hiring a Heating and Cooling Contractor. ENERGY STAR (U.S. EPA and DOE). Accessed Oct 25, 2026
  3. 3.Air Conditioners and Heat Pumps (homeowner resources). Air-Conditioning, Heating, and Refrigeration Institute (AHRI). Accessed Oct 25, 2026
  4. 4.Manual J. Air Conditioning Contractors of America (ACCA). Accessed Oct 25, 2026
  5. 5.Section 608 Technician Certification Requirements. U.S. Environmental Protection Agency. Accessed Oct 25, 2026
  6. 6.Warranty (homeowner resources). Carrier. Accessed Oct 25, 2026
  7. 7.Trane Warranties Explained. Trane. Accessed Oct 25, 2026
  8. 8.Products Under Warranty (FAQ). Lennox. Accessed Oct 25, 2026
  9. 9.Limited Warranty, DMVT/DMVE/DFVE (PWDAHPQB). Daikin. Accessed Oct 25, 2026
  10. 10.Register Your Product. Mitsubishi Electric Trane HVAC US. Accessed Oct 25, 2026
  • Dual fuel and hybrid heat pump systemsA dual fuel system pairs an electric heat pump with a gas or propane furnace and switches between them at an outdoor temperature you can choose based on capacity and fuel prices.
  • How to read a heat pump quoteA useful quote names every component by model number, ties the efficiency ratings to an AHRI certificate, and states what is included and excluded so two quotes can be compared line by line.
  • Variable-speed vs single-stage heat pumpsSingle-stage heat pumps run at one capacity, two-stage at two, and variable-speed (inverter) units adjust continuously, which changes cycling, humidity control and cold-weather output.